Asbestos Procedure 5 Clean up
What is an Asbestos Procedure 5?
as defined by the SCAQMD guidelines for Asbestos Procedure 5 site clean-ups Rule 1043 Asbestos Procedure 5 plans
Asbestos Procedure 5 Plans are required to clean-up any disturbed Asbestos Containing Materials, but not limited to:
- Removal of asbestos after a renovation or non-burning demolition activity – R1403(d)(1)(C)(ii)(III),
- Clean-up of any Associated Disturbance1 of Asbestos Containing Material – R1403(d)(1)(C)(ii)(V),
- Removal of asbestos using an alternative combination of techniques and/or engineering controls – R1403(d)(1)(D)(i)(V)(1),
- Removal of asbestos using pre-approved, specific techniques and/or engineering controls – R1403(d)(1)(D)(i)(V)(2), and
- Removal of asbestos that has suffered damage from fire, explosion, or natural disaster – R1403(d)(1)(D)(ii)(I).
Examples of asbestos abatement projects requiring Approved Alternative Asbestos Procedure 5 Plans are, but not limited to:
- Clean-up of any spill or improperly removed, handled or disposed ACM, nonfriable Class II ACM or ACWM
- Decontamination of living or working areas requiring a clearance level of 0.01 f/cc2
- Clean-up of ACM, ACWM, and asbestos contaminated soil from crawlspaces from any site, and
- Clean-up of buried ACM or ACWM from landfills, waste sites, grading operations, etc.
- Open-air abatement of Class II nonfriable ACM using mechanical methods
- Request for using power tools to remove asbestos inside modified containments
- Demolition of “red tag” buildings (structurally unsound)
- Clean-up of ACM delamination, fallout or damage due to building settling, weathering, seismic events, improper maintenance practices, impacted during building operations, etc.
Our asbestos removal technicians are fully certified and highly experienced in the asbestos removal procedures required for each Asbestos Procedure 5 project.
We pride ourselves in providing complete customer satisfaction. Our highy qualified and experienced asbestos removal technicians strive to provide top quality work in all aspects of our trade.
Please feel free to call us if you have any questions about Asbestos Procedure 5 work plan requirements or removal procedures, we will be happy to answer your questions
Our Services Include
- Asbestos Removal
- Asbestos Procedure 5 Clean up
- Demolition Services
- Hand Wrecking
- Concrete Breaking
- Structure Demolition
- Site Clearing
- Lead Paint Removal / Clean up
- 24 Hour Emergency Services
- Mold Remediation